2CV Rebuild 14

Now we are waiting for the repaired body to come back, so anything outstanding on the rolling chassis has now been attended to.

The carburettor has been drilled and tapped for the 123 ignition unit’s vacuum sensor, I’ve got a fitting for the oil temperature gauge to install and a pressure pick-up under the oil filter. These are to feed to additional instruments which are going to be installed The new dash panel is starting to come together, with the shape cut out and switch / instrument positions drawn on. Before proceeding too much further, this needs to be trial fitted into the body.

may15 002
New versus original. The replacement dash will utilise toggle switches and a more comprehensive range of instruments.
may15 004
Rolling chassis with all the mechanical components, engine electrics and bumpers installed

may15 005 may15 006

Related Posts

Uncategorized

Pump it up!

Facet fuel pumps Is your fuel pump delivering the right amount of fuel at the right time? If…
Tour Ireland – Day 2 (PM) & Day 3
2CV Rebuild 15
Menu